Beligium Biogas complex

At the Ghent Renewable Energy Complex, the inaugural component of our integrated system comprises a cutting-edge biogas facility. This biogas plant, boasting the highest capacity utilization rate in Belgium, serves a dual purpose by generating electricity and providing essential raw materials for the CatLiq and Organic Fertilizer Plants.

Plant Specifications:

  • Electrical generation capacity: 3.7 MW
  • Capacity factor: 95%
  • Reactors: 3
  • Gas engines: 3
  • Operational principle: Thermophilic
  • Desulfurization unit: Bacteriological
  • Operational schedule: 7 days / 24 hours

Primary Plant Inputs:

  • Poultry farm waste
    Cattle waste
    Rice stems and rice husk
    Caustic dairy plant wastes
    Slaughterhouse waste
    Yeast factory wastes
    Other organic industrial wastes

Expert services for development and construction.

A key contributor to the success of our integrated energy and fertilizer facility in the UK, which serves as both an environmental endeavour and a significant economic asset to the United Kingdom, is the inclusion of an organic liquid fertilizer factory.

This facility processes liquid waste derived from the biogas plant. Designed and constructed entirely by Green Wave Energy LTD, it incorporates cutting-edge technologies developed and owned by the company.

Primary Materials (Inputs):

  • Liquid phase of biogas digestate
  • Vinasse
  • Hot air heated by exhaust gas of biogas engines
  • Hot water from jacket cooling of biogas engines

End Products (Outputs):

  • Hygienic, stabilized, organic liquid fertilizer with 30-40% dry matter
  • Hygienic, stabilized, organomineral liquid fertilizers

Integrity, safety, quality, and sustainability form the core of our corporate values. We foster a respectful, inclusive environment, embrace challenges, and prioritise continuous learning.